Menu

Hydroelectric Dam Temperature Control Structure Evaluation

hydro dam, environmental consulting services

Our Role

Four Peaks staff provided technical support for an evaluation of the efficacy of a temperature control structure installed in a Washington dam to modulate temperature in the forebay in the vicinity of the adult fish ladder exit. The study evaluated the temperature changes within the forebay as a result of the temperature control spray operation and used that in the context of potential migration paths for migrating salmonids.

At A Glance

Client Type
Public

Location
Washington

Project Timeline
2017

Service Area(s)
,

Project Manager: Joseph Miller, MSC

footer-logo